Email Envelope Icon

You are using an old browser

GF Electrical does not support older versions of browsers due to our commitments to ensuring your experiance and safety on GF Electrical are well looked after.

Dont worry though, you can click the button below to upgrade your browser.

Case Studies

View case studies about recent work and testimonials from our clients.

Quantum

Quantum was redesigning their office space. They instructed an interior design company, and we were contacted due to being recommended to Debbie the Managing Director.  

Read Case Study
Bristol Maid

The property is a very large site that is used for production of hospital equipment. The client provided us with their annual shutdown period to do maintenance. In this two-week period, we were asked to complete an upgrade of all their lighting.

Read Case Study
Sovereign Plant Rooms

Sovereign contacted us last year to ask for ‘Plant Room updating’ works to be completed. The plant room systems are, in most cases, out of date causing boiler failures.

Read Case Study
Spaceway South Ltd

The size of the warehouse is approximately 3000 square metres. The client was extending their current premises by adding more floor space with a mezzanine, nearly doubling their storage area.

Read Case Study
Pre-Planned Maintenance (PPM) – Burns Hamiliton

Burns Hamilton Ltd one of the leading Property Management companies in Hampshire and Dorset. They have been a client of ours for over 15 years. We carry out maintenance for a good 80% of their properties.

Read Case Study
Spaceway South Ltd

The size of the property is approximately 20,000 square foot. The project was to install all new lighting, dedicated and general power, services for welfare facilities, and an office-fit out.

Read Case Study
Cutwrights

The premises is a 30m by 35m brand-new unit. It was a bare shell, with minimal fire alarm and electrical installation, only a basic distribution with a few lights in the office plus facilities (toilets).

Read Case Study
Grotto and Winter Wonderland

Family-run business, Stewart’s Garden Centres, wanted to change the way that their Grotto’s and Winter Wonderland’s are set up, ready for Christmas.  

Read Case Study
Cutwrights Fire Alarm

Cutwrights uses the latest in automated machinery to provide the ultimate cutting, edging, and drilling service, across a huge range of boards and finishes. The company is moving from London to Fleets Corner, Poole.    

Read Case Study
Parkstone Yacht Club

Parkstone Yacht Club was established in 1895 and is situated on the north shore of Poole Harbour. The lights in Parkstone Yacht Club’s car park were in a poor state of repair and required replacement with modern LED light, of better performance. 

Read Case Study
Stewart’s Garden Centre – Broomhill

One of three large Garden centres of this family-run business took the opportunity to look at their kitchen and the way that they were serving their food, during the COVID lockdown.

Read Case Study
Bristol Maid – EICR

Ensuring the electrical installation is safe, an Electrical Inspection Condition Reports (EICR) is required.  The inspection rolls round the whole site on a three-year basis due to their site being an industrial environment. 

Read Case Study